Solution
MIXIND® distributes supply air throughout the hall using specially designed pulsors.

Daimler Truck AG · Gaggenau
Starting point
The production area in Gaggenau required an air distribution system suitable for retrofitting that took account of the existing hall geometry and ongoing operations.
A SINTRA MIXIND® system was planned together with TGA Zimmermann und Becker and installed in 2024.
MIXIND® distributes supply air throughout the hall using specially designed pulsors.
The retrofit was integrated into the existing building with the building services partners involved.
The system was tested with the involvement of SINTRA, the Institute of Industrial Aerodynamics and fire safety stakeholders.