MIXIND air distribution in the Daimler Truck production hall

MIXIND® for 5,000 m² of production space

Daimler Truck AG · Gaggenau

5,000 m²Floor area
37,500 m³Room volume
up to 9 mRoom height
48,000–75,000 m³/hAirflow rate
2024Installation

Starting point

Air distribution in a large existing industrial hall.

The production area in Gaggenau required an air distribution system suitable for retrofitting that took account of the existing hall geometry and ongoing operations.

A SINTRA MIXIND® system was planned together with TGA Zimmermann und Becker and installed in 2024.

Solution

MIXIND® distributes supply air throughout the hall using specially designed pulsors.

Implementation

The retrofit was integrated into the existing building with the building services partners involved.

Testing

The system was tested with the involvement of SINTRA, the Institute of Industrial Aerodynamics and fire safety stakeholders.

Interested?

Describe the current situation in your project to us. We will create a tailor-made solution for you using our products.